Rebecca Zagozewski, executive director of the Saskatchewan First Nations Water Association, said she has seen contractors save on costs when building water treatment plants on reserves by using obsolete parts and failing to include maintenance manuals, ventilation or chemical rooms, and bathrooms. “Engineering companies will put in their bids obviously as low as they can go,” said Zagozewski.
After three months without water, the taps are running again in Big Grassy River First Nation
Water is flowing through the taps once again in Big Grassy River First Nation after three months without consistent, potable water. However, the current water is untreated and coming directly from Lake of the Woods as the community waits for repairs to the water filtration system. The result is that community members have had to go to the beach to collect water for basic sanitation needs, and buildings have been shuttered and the school remains closed to students until a running, drinkable water service is restored.